Project Description

Vogel Bros. was commissioned for the construction of a new water production facility for Polk County. The two million gallon concrete storage tank included a tank mounted cascade tray aerator, outdoor high service pump station, and bulk hypochlorite storage and feed system. We also constructed a prefabricated concrete building for plant electrical gear and controls, installed an emergency power generator and above ground dual wall concrete diesel storage tank, created access roads, installed storm water piping, and installed electrical instrumentation, radio and cable communications and a site security system.