Project Description

Maintained a temporary mobile centrifuge sludge dewatering system for three months while the existing belt filter presses were replaced, demolition of 2 existing 2.0-meter Von Roll belt filter presses, associated flocculation tanks, belt conveyor, cake discharge chutes, polymer make-up & feed systems, control room, all associated concrete pads, piping, & motors; installation of 2 new polymer blending systems, 2 horizontal screw presses, 2 dewatered cake pumps, structural modifications to existing facility, truck canopy, misc. piping & valve mods, integration of dewatering control system into WWTF supervisory control & SCADA system, modification of electrical & control systems for dewatering system, & installation of new control panels with prefabricated control room enclosure.