­

Deerfield High School / Middle School

,

Vogel Bros. Building Co. has partnered with the Deerfield Community School District Middle/High School for several renovations and addition since 2010. Our first project was an interior office renovation of approximately 2,225 square feet that was completed in eight weeks. The revised office space included a new reception area, offices, health room, work room, guidance reception, and two new conference [...]

Cambridge High School

,

The Cambridge High School renovation project began during the final month of the school year, with the majority of the renovation taking place once school was complete during the summer. Vogel Bros. renovated the student restrooms, kitchen, cafeteria, computer lab, library, student corridor, offices, and locker rooms. The HVAC and electrical systems throughout the existing [...]

Glacier Edge Elementary School

,

The Glacier Edge Elementary school was a new building designed to house grades K-5 for the Verona School District. The brick for the façade was donated by a local business, and the structure incorporates green building practices utilizing a geothermal heating and cooling system, special daylighting and sun shades for cooling. There are 20 primary [...]

Glacial Drumlin Middle School

,

The Monona Grove School District spent years of study, planning and analyzing different grade configurations for this two-community school district. The result is Glacial Drumlin Middle School, a grade 5 – 8 campus that accommodates 850 students. The school is unique in that the students in fifth and sixth grade are Cottage Grove residents and [...]

St. Maria Goretti Church and School

, ,

The St. Maria Goretti project includes a 1,905 square foot addition to the west side of the church and 4,280 square foot remodeling of the narthex. The addition allows for a spacious greeting area and an increase in worship space. The school consists of a 24,080 square foot addition including a gym, 1,290 square foot [...]

Stoner Prairie Elementary

,

Stoner Prairie Elementary selected Vogel Bros. as their construction manager for the construction of their new gymnasium, mechanical mezzanine, additional classrooms, playground area and parking expansion. The building is composed of bearing and non-bearing concrete masonry block walls, so brick accents were added to the new building envelop with glazed mason block to match the [...]

Deerfield Elementary School

,

Deerfield Elementary School hosts 34 classrooms for grades pre-K through 6th grade. Features include an art education area, music facilities, a gymnasium, production kitchen, cafeteria and a library resource center. Amenities for the staff include admiration areas and miscellaneous support facilities.

Mount Horeb Intermediate Center & Athletic Complex

,

Vogel Bros. provided construction management services to the Mount Horeb Area School District for both their athletic complex renovation and the construction of their new intermediate center. The athletic complex renovation included their varsity soccer field with lighting, bleachers, press box and underdrainage and irrigation system. The Intermediate Center was designed to house grades 3-5 [...]

Mount Horeb High School

,

Mount Horeb Area School District selected Vogel Bros. to complete a major renovation and addition to the high school. The project included two major additions: a performing arts auditorium and a classroom wing. Extensive remodeling of the existing facility helped upgrade the high school to meet facility needs. Vogel Bros. actively assisted the District with [...]